Hyperion 900x250
Log In
Access Premium Site»
Not a member? Join today!

Hangar 9 P-47 Build (assembly) day 5

Hangar 9 P-47 Build (assembly) day 5

Here is the video of the fifth day of assemble on the Hangar 9 P-47 Thunder Bolt.  I finished up with the gas tank and then I moved on to the cowl installation and this took the most time of anything because I can’t take the cut back, so I proceeded slowly.  I got the retracts all hooked up and working so at least I can land this mean machine.  Still more to come….

[kaltura-widget uiconfid=”1727911″ entryid=”0_oqdu56m1″ width=”640″ height=”390″ addpermission=”” editpermission=”” /]

Hangar 9 P-47 Build

Hangar 9 P-47 Build

Hangar 9 P-47 Build

Updated: June 1, 2015 — 11:56 AM

Leave a Reply

Your email address will not be published. Required fields are marked *

Airage Media © 2016
WordPress Lightbox Plugin