Flight Journal Veterans day 900x250
Log In
Access Premium Site»
Not a member? Join today!

Hangar 9 P-47 Build (assembly) day 3

Hangar 9 P-47 Build (assembly) day 3

Here is the video of the third day of assemble on the Hangar 9 P-47 Thunder Bolt.  I finished installing all of the control surfaces and moving on to the engine.  So far the construction is moving along well and the part fit had been outstanding.  The manual is very complete and explains everything well.   Anyone, with very little building experience, can build this plane.  After the engine installation, I start working on the cockpit…stay tune.

[kaltura-widget uiconfid=”1727911″ entryid=”0_806dvlyu” width=”640″ height=”390″ addpermission=”” editpermission=”” /]

 

Updated: June 1, 2015 — 11:43 AM
Venom Fly 600x120
Digital Downloads 600x120

2 Comments

Add a Comment
  1. scary at the end John! :^)

  2. lol but boy is he fassstttt… lol

Leave a Reply

Your email address will not be published. Required fields are marked *

Air Age Media © 2018
Assign a menu in the Right Menu options.
WordPress Lightbox