Workshop Build-Along — Sopwith Camel Part 8 — Tail Surface Attachment & turtle-deck
This weekend was pretty productive as I now have the tail surfaces finished and installed. These were made removable for maintenance and for access to the tailskid’s suspension bungee setup. Under the horizontal stabilizer base, I glued 1/4-inch balsa cross pieces and installed 4-40 blind nuts in four locations matching holes drilled into the stabilizer. […]